Review of Hydrological Study for Optimizing the Use of King Fahd Dam Water in Bisha
Hexa Line Projects is responsible for the full design and construction supervision of the Boujitel Hotel, a 4-star hospitality establishment in Madinah, for Bouji Hospitality Services Company. The project is currently at its final design stage, with design documentation being finalized for construction commencement. The hotel is intended to serve the significant pilgrim and visitor population that Madinah attracts throughout the year.
| Client | General Organization for Irrigation |
| Region | Bisha, Asir Region |
| Year | 2021 |
| Category | Hydrological Study Review |
Objectives
- Review the hydrological methodology and data used in the original King Fahd Dam study.
- Assess the validity of water availability estimates and utilization optimization recommendations.
- Identify technical gaps or areas requiring additional analysis.
- Provide independent recommendations for enhancing water use efficiency from King Fahd Dam.
Methodology
The review process involved detailed analysis of the submitted hydrological study documentation, cross-referencing of data sources, and independent verification of hydrological calculations. Comparison was made against updated hydrometeorological datasets for the Bisha catchment. Field reconnaissance was conducted to verify assumptions about irrigation infrastructure and demand patterns.
Deliverables
- Technical review report with structured findings.
- Assessment of hydrological data quality and modeling assumptions.
- Recommendations for study updates and operational improvements.
- Executive brief for General Organization for Irrigation leadership.
Significance & Impact
King Fahd Dam in Bisha is a critical resource for agricultural water supply in the region. Ensuring that the hydrological basis for its optimal use is technically sound protects the investment in dam infrastructure and supports the livelihoods of farming communities dependent on reliable irrigation water supplies.